

- This event has passed.
Project Connect: Orange Line Open House
November 6, 2019 @ 5:00 pm - 7:30 pm
Project Connect will be built on two main corridors of high-capacity transit, the Orange and Blue Lines. Help CapMetro design the Orange Line: Bus or rail? How to cross the river? What does it cost? Routes 10 and 315